Ana Petrova
Interconnection Desk · The Sovereignty Desk
The paperwork is the moat; drain it.
Ana covers interconnection — the bureaucratic gauntlet between a finished solar install and permission to switch it on. The paperwork is the moat, she says, and her job is to drain it. She treats utility delay as a profit strategy rather than an engineering necessity: every month a finished system waits, the household keeps buying full-price power from the company running the queue. She compares the states that grant approval in days against those that take months, names the specific stalling tactics, and points to the exact rule change that would end each one.
DER interconnection rules, queues, fees, timelines, IEEE 1547, hosting capacity, utility delay tactics